Active procurement
A solicitation document will be provided when interested bidder sends a request letter along with the paid fee following the posting of the specific procurement notices.
When Request for Expressions of Interest for the consulting service assignment is posted, interested consultants shall obtain the detailed information related to the assignment only through the ADB’s Consultant Management System /CMS/ and the submission will follow using the standard Express of Interest template.
Contract no | Procurement announcement | Status | Posted on | Deadline |
---|---|---|---|---|
DS-WSNR17C | Design Supervision by Author | Closed | 2018-08-10 | 2018-09-10 |
SSF05 Lot 1 | Kindergarten in Selbe subcenter | Closed | 2018-07-02 | 2018-08-03 |
SSF05 Lot 2 | Business Incubator Vocational Training Center in Selbe subcenter | Closed | 2018-07-02 | 2018-08-03 |
T2-CS01 | Consulting service contract for Detailed engineering design and supervision | Closed | 2018-05-21 | 2018-07-09 |
ES-WSNR17B | Engineering Supervision | Closed | 2018-04-30 | 2018-05-31 |
ES-WSNR17C | Engineering Supervision | Closed | 2018-04-30 | 2018-05-31 |
ES-BSWR10 Lot 2 | Technical Supervision by NHOG | Closed | 2018-04-30 | 2018-05-31 |
PP01-DD | Detailed design and construction supervision of Affordable housing Pilot Project in Selbe subcenter | Closed | 2018-04-26 | 2018-06-08 |
CSBHF06A | Detailed designs of extension of existing heating network | Closed | 2018-04-18 | 2018-05-18 |
DS-WSNR17A | Design supervision by Author | Closed | 2018-04-09 | 2018-05-11 |
DS-WWTPR01 | Design Supervision by Authors | Closed | 2018-04-02 | 2018-05-02 |
ES-WWTPR01 | Engineering Supervision | Closed | 2018-04-02 | 2018-05-01 |
ES-WSNR17A | Engineering Supervision | Closed | 2018-04-02 | 2018-05-01 |
ES-BSDF07 Lot 1 | Engineering Supervision | Closed | 2018-04-02 | 2018-05-01 |
ES-BSDF07 Lot 2 | Engineering Supervision | Closed | 2018-04-02 | 2018-05-01 |
ES-BSWR10 Lot 1 | Technical Supervision by NHOG | Closed | 2018-04-02 | 2018-05-01 |
BHF06B | Design, Supply and Installation of Heating Pipeline network in Bayankhoshuu sub-center | Closed | 2018-03-23 | 2018-05-10 |
WSNR17B | Extension of water supply main to Tasgan water reservior to Western area water reservior | Closed | 2018-03-10 | 2018-04-11 |
SEC13 | Electricity and telecommunication network in Selbe Sub-Center | Closed | 2018-02-26 | 2018-04-09 |
BSWR10 Lot 2 | Construction of water reservoirs and supply pipes in Selbe Sub-Center | Closed | 2018-02-22 | 2018-03-23 |
BEC13 | Electricity and telecommunication network in Bayankhoshuu Sub-Center | Closed | 2018-02-14 | 2018-03-28 |
SRDH11 | Roads, heating network, and associated infrastructure in Selbe Sub-Center (Phase 1) | Closed | 2018-01-23 | 2018-02-23 |
BSLS09 Lot 1 | Landscaping in Bayankhoshuu subcenter | Closed | 2017-12-22 | 2019-04-01 |
BSLS09 Lot 2 | Landscaping in Selbe subcenter | Closed | 2017-12-22 | 2018-02-06 |
BRDH14 | Roads, heating network, and associated infrastructure in Bayankhoshuu Sub-Center (Phase 2) | Closed | 2017-12-15 | 2018-01-15 |
WSNR17A | Extension of wastewater collector main from 100 ail areas to Bayanburd and Extension of water supply main from North East water reservoir to Tasgan water | Closed | 2017-12-11 | 2018-01-23 |
BSPE | Water Supply and Sewage Pipes in Bayankhoshuu and Selbe Sub-Centers (Phase 1) | Closed | 2017-11-21 | 2017-12-11 |
BSWR10 Lot 1 | Construction of water reservoirs and supply pipes in Bayankhoshuu Sub-Centers | Closed | 2017-11-09 | 2017-12-05 |
HХААГ-17/0206 | “Сэлбэ, Баянхошуу дэд төв төслийг хэрэгжүүлэх явцад байгаль орчны хөндлөнгийн хяналт, үнэлгээ хийх” зөвлөх үйлчилгээний гэрээ | Closed | 2017-10-11 | 2017-11-30 |
BSDF07 Lot 1 | Lot-1. Flood protection and embankment (combined for culverts and embankment) Bayankhoshuu sub-center | Closed | 2017-10-11 | 2017-11-21 |